LOCATIONS
Find the nearest practical handoff.
Availability is facility-specific. Use the directory as a starting point, then validate your exact address with engineering.
Location data is being prepared.
Use the request form to validate a specific facility or address.
FACILITY CHECK
Location data has an owner and a date.
Public availability is a starting point. The exact handoff is confirmed against the facility, product and requested port.
| Field | Why it matters | Confirmed by |
|---|---|---|
| Facility | Determines cross-connect, meet-me room and delivery path. | Site operations |
| Product | Transit, DIA, cloud and peering have different handoffs. | Network engineering |
| Port | Capacity, optics and lead time change the order. | Delivery team |
| Verified date | Availability ages; a current check prevents stale assumptions. | Account owner |
WHAT TO PREPARE
Make a site check useful on the first pass.
Facility or street address
Include the data center name, city and country. A specific room or suite helps when available.
Product and port
Name the product, target bandwidth and whether the handoff is single or redundant.
Routing requirement
Share ASN, IPv4/IPv6 needs, BGP or static routing and any policy constraints.
Timeline
Give the desired service-ready date and any maintenance or change-window constraints.
FacilityMeet-me room and cross-connect validation.
ProductExact handoff and operating boundary.
PortCapacity, optics and delivery lead time.
DateLast verified timestamp and owner.