NETWORK

A network drawn for operators.

Fizp treats routing, handoff and observability as one operating system for connectivity.

UPSTREAMS
FIZP BACKBONE
IX / CLOUD

Backbone principles

Routing is part of the product.

We publish the boundary, the handoff and the operational signals that matter to the teams running traffic.

Route policy and security

Policy, filtering and announcements are explicit parts of delivery.

Performance and events

Port, flow, latency, loss and BGP events form one operational view.

Failure boundaries

Each facility and upstream path has a documented blast radius.

Upstreams and interconnects

Legible at the level you need.

01

Route policy

RPKI, IRR and communities are reviewed with the network team.

02

Interconnect

Public topology is shown only at the level approved for publication.

03

Events

Maintenance and network status are linked to a clear update path.

Download brief

ROUTING CONTROLS

Signals that keep a path honest.

The network page should answer what is announced, what is filtered and what an operator can inspect before opening a ticket.

ControlWhat it changesWhat the operator reviews
RPKI / ROAValidates origin authorization for announced prefixes.Validity state, origin ASN, expiry.
IRR filtersConstrains accepted and propagated route objects.AS-SET, route objects, review date.
BGP communitiesExpresses local preference and propagation intent.Community map, prepend and no-export behavior.
Blackhole / diversionDefines the emergency traffic path for protected space.Trigger, scope, escalation and rollback.

OBSERVABILITY

Measure the path, not only the port.

PortState, errors and negotiated capacity.
FlowTraffic shape, peaks and direction.
LatencyRegional RTT and path changes.
BGPSession state, updates and events.

Network status

Operations are part of the architecture.

01 / DETECT

Signal changes

Telemetry identifies a port, path or routing event.

02 / TRIAGE

Find boundary

Separate facility, upstream, customer and policy causes.

03 / COMMUNICATE

Share update

Maintenance or incident detail is linked to a timestamp.

04 / REVIEW

Close loop

Capture the route, impact and next engineering action.

Talk to network engineering