服务地点

找到最近的可行交接点。

可用性以机房为单位确认。先用目录缩小范围,再由工程师验证准确地址。

机房Region · Facility · Product · 已校验

地点数据正在准备中。

Use the request form to validate a specific facility or address.

最后校验

FACILITY CHECK

Location data has an owner and a date.

Public availability is a starting point. The exact handoff is confirmed against the facility, product and requested port.

FieldWhy it mattersConfirmed by
FacilityDetermines cross-connect, meet-me room and delivery path.Site operations
ProductTransit, DIA, cloud and peering have different handoffs.Network engineering
PortCapacity, optics and lead time change the order.Delivery team
Verified dateAvailability ages; a current check prevents stale assumptions.Account owner

WHAT TO PREPARE

Make a site check useful on the first pass.

Facility or street address

Include the data center name, city and country. A specific room or suite helps when available.

Product and port

Name the product, target bandwidth and whether the handoff is single or redundant.

Routing requirement

Share ASN, IPv4/IPv6 needs, BGP or static routing and any policy constraints.

Timeline

Give the desired service-ready date and any maintenance or change-window constraints.

FacilityMeet-me room and cross-connect validation.
ProductExact handoff and operating boundary.
PortCapacity, optics and delivery lead time.
DateLast verified timestamp and owner.

查询机房可用性

联系网络工程师